I spoke with the builder this past week and he told me that on Thursday, August 24th we would have a load of lumber delivered to the build site. Of course I was anxious to get up to the site to see the pile of lumber (and any progress that was made). With my drone in tow, I made it up to the build site for the cabin and grabbed these photos of the piles of lumber, and the progress.
![camp08261701](https://campcabin.wordpress.com/wp-content/uploads/2017/08/camp08261701.jpg?w=840)
![camp08261702](https://campcabin.wordpress.com/wp-content/uploads/2017/08/camp08261702.jpg?w=840)
![camp08261703](https://campcabin.wordpress.com/wp-content/uploads/2017/08/camp08261703.jpg?w=840)