Got back up to the property to do more work on the outhouse. We drove up Friday evening with 14 sheets of OSB in the back of the truck and everything we needed to put up the walls and put on the roof. After two long, hard days of working, the outhouse is ready for shingles and some siding!
Next weekend I hope to be able to install part of the venting as well as some fascia and drip flashing for the roof. Once the construction on the cabin wraps up, we can use leftover material from it (board and batten siding and perhaps metal roofing) to finish the exterior of the outhouse.