Well, it has been a long road for the outhouse. Construction started over a year ago with the sitting of the tank in the ground. As of last weekend I started the last (I hope) part of construction; finishing the inside walls with bead board. The ceiling is up along with an interior light, complete with a fan! We are staining the bead board before we install it, so this part is going a bit slow, but I hope to have the outhouse completed in the next 3 to 4 weeks.
![20180909_162958893_iOS](https://campcabin.wordpress.com/wp-content/uploads/2018/09/20180909_162958893_ios.jpg?w=840)